Holiday Office Closure

In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

Uranium Exploration

In 1975, the Texas Legislature gave the Railroad Commission jurisdiction to regulate surface mining for coal and uranium. No surface mining for uranium is currently conducted but uranium exploration continues to be conducted for in situ uranium mining operations and is administered by the Surface Mining and Reclamation Division (in situ uranium mining is regulated by the Texas Commission on Environmental Quality). Active uranium exploration sites are inspected monthly.



Commissioners