Holiday Office Closure

In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

Resources for Homeowners

The Railroad Commission of Texas (RRC) adopted the Pipeline Damage Prevention Rules under Title 16 of the Texas Administrative Code, Chapter 18.  The rule, which became effective September 1, 2007, applies to pipeline operators and persons engaged in or preparing to engage in excavation activities in the vicinity of a pipeline.

HOMEOWNER

Damage Reporting Form

This form is to be completed by an Excavator/Homeowner following a pipeline damage.

NO DAMAGE NON-COMPLIANCE REPORTING FORM 

 This form can be completed by a Excavator/Homeowner or an Operator to report Non-Compliance of Chapter 18 where no damage has occurred.


Calling
811 Before You Dig

About 811  - Texas law requires homeowners to contact 811 two-business days (excluding weekends and holidays) before digging, even if you’re working in your own backyard.

Texas811 Process Video 

 



Commissioners