Holiday Office Closure

In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

RRC Announces Public Comment on New Proposed Rules for Geothermal Energy

October 02, 2024

Texas has been at the forefront of energy regulation and innovation for more than a century, and the RRC has new proposed rules for public comment to administer legislation in the geothermal energy front in Texas.

Senate Bill 786 transfers regulatory authority of closed-loop geothermal injection wells from the Texas Commission on Environmental Quality to the Railroad Commission, allowing the RRC jurisdiction and permitting authority for these types of wells.

The new rules specifically address shallow closed-loop geothermal systems, including the associated injection wells, which are used to heat or cool buildings without conversion to electricity.

The RRC is the primary agency that has oversight of injection wells, and transferring regulatory authority for shallow closed-loop geothermal injection wells to the Commission will streamline the process for operators who want to drill and operate geothermal injection wells of this type. The proposed rules require engineering and infrastructure safety measures to ensure protection of groundwater.

The proposed new rules and comment forms are available online at https://www.rrc.texas.gov/general-counsel/rules/proposed-rules/ under Chapter 6. Geothermal Resources. The deadline for comments is November 12, 2024.

###


About the Railroad Commission:
Our mission is to serve Texas by our stewardship of natural resources and the environment, our concern for personal and community safety, and our support of enhanced development and economic vitality for the benefit of Texans. The Commission has a long and proud history of service to both Texas and to the nation, including more than 100 years regulating the oil and gas industry. The Commission also has jurisdiction over alternative fuels safety, natural gas utilities, surface mining and intrastate pipelines. Established in 1891, the Railroad Commission of Texas is the oldest regulatory agency in the state. To learn more, please visit https://www.rrc.texas.gov/about-us/.