Holiday Office Closure

In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

Texas Drilling Permits and Completions Statistics for March 2020

April 15, 2020

AUSTIN –– The Railroad Commission of Texas issued a total of 744 original drilling permits in March 2020 compared to 1,137 in March 2019. The March 2020 total includes 671 permits to drill new oil or gas wells, six to re-enter plugged well bores and 56 for re-completions of existing well bores.

The breakdown of well types for original drilling permits in March 2020 is 189 oil, 43 gas, 468 oil or gas, 40 injection, and four other permits.

In March 2020, Commission staff processed 1054 oil, 313 gas and 240 injection completions for new drills, re-entries and re-completions, compared to 493 oil, 127 gas, and 43 injection completions in March 2019.

Total well completions processed for 2020 year to date for new drills, re-entries and re-completions are 3,857, compared to 2469 recorded during the same time period in 2019.

Recent Information Technology changes are allowing the Commission to report more detailed data on drilling permits and well completions each month. The information in prior year reports may not correlate exactly to the same results on the new report.  These technological improvements provide more statistics and transparency, and the new report is available on the Commission’s monthly drilling completion summaries web page.

 

TABLE 1 – March 2020 TEXAS OIL AND GAS New DRILLING PERMITS AND COMPLETIONS BY RAILROAD COMMISSION OF TEXAS DISTRICT*

*A district map is available on the Railroad Commission of Texas website


About the Railroad Commission:
Our mission is to serve Texas by our stewardship of natural resources and the environment, our concern for personal and community safety, and our support of enhanced development and economic vitality for the benefit of Texans. The Commission has a long and proud history of service to both Texas and to the nation, including more than 100 years regulating the oil and gas industry. The Commission also has jurisdiction over alternative fuels safety, natural gas utilities, surface mining and intrastate pipelines. Established in 1891, the Railroad Commission of Texas is the oldest regulatory agency in the state. To learn more, please visit https://www.rrc.texas.gov/about-us/.